Main floor beams are in place
Noble Construction begins to get the flooring on the first floor
The floor joists are in place and ready for the sub flooring.
The walls start to go up!
Clyde Maynard of Maynard & Oliviera Concrete Pumping donates his trailer pump to help us get the basement floor in Elaines’s Place poured!
 
Dwayne Reynolds, Project Manager of Collins& Jewell CO. Inc. and associate meet with Rich Lambert/ Gilbane and Shaun Smith/Noble Construction to field measure for steel
Bob , Eddie, Amon and Josh work to finish the floor.
 
Time for the siding for the first floor
Now the house wrap
Shaun explains to Chris the layout of the first floor
 
Steel columns from Collins & Jewell, are being raised by Jim , Glenn and Shaun Smith
as they get ready to work on the second floor.
 
The out side joists are in place for the second floor .
The Noble Team works on setting the joists in the steel columns.
The second story floor is on
 
The first story roof trusses arrive
Beginning to get the roof in place!
Two sections of the first floor roof are on
   
Even with this week of fridged cold and wind, the crew of Noble Construction works on the second story framing
Shaun Smith/Noble Construction explains a spacing issue at the weekly construction meeting. Also present are Chris, Rich Lambert,/Gilbane Construction, Paul Copp and Jack Carney / Coventry Lumber
Rich Lambert/ Gilbane Construction confers with Shaun and Chris about the floor strength.
   
Interior walls are being framed
The second story roof trusses are in place
Getting the plywood on
Closing up the building.
The shingling continues during each available day!
Framing on the second floor