Mark
and Ray of Garrison General Contracting set sign posts
|
Most
of the siding is on the south side now |
Ben
and John from Gilbane spray the primer |
 |
 |
|
Brian
Eaton , Gilbane primes with the crew
|
Brian
Eaton gives the team captains their assignments for
the Gilbane Giving Back to the Community day on May
5th. |
Over
50 people volunteered to paint the entire Crossroads
building and help with outside clean up.
|
 |
 |
|
Luan
is in place to begin the flooring.
|
Floors
are vacuumed prior to application of material by
Hundt Industrials, team member Aaron |
Chris
Hundt, president of Hundt, Industrials begins the flooring
process by sealing the floor.
|
 |
 |
 |
| P&J
Sprinkler staff install the main water lines in the
basement. |
Hundt Industrials,
LLC begins the final flooring process with adding the
color flakes in the bathroom floor |
Light fixtures are
installed on the first floor |
 |
 |
 |
Members
of the Capital Campaign committee meet for the final
time to wrap up
business |
Noble
Construction works on the tower |
The
floor is totally installed thanks to several long
days and nights by Hundt Industrials, LLC owner Chris
Hundt and his team! |
 |
 |
 |
| Kitchen cabinets start
to get in place |
Interior partitions
go in place to divide the sleeping areas
|
Bathroom fixtures
are installed |
 |
 |
 |
The
Exam room in the Health Center takes shape |
The tower construction
continues as Chris and Art Quirk look on |
Sandy
Rice of the Brickman Group landscaping company and
Camp Horizons board member, designs the planting beds
around the Crossroads
|
 |
 |
 |
Brickman
workers build the wall on the west side |
Eddie
moves the large rocks with the skid steer while others
place the stone |
Sandy
measurers for the top of the wall height |
 |
 |
 |
The
interior doors get painted
|
Bob
and Josh place the new sign posts
|
Railing
on the tower is installed
|
 |
 |
 |
Steve
St’Onge raps the duct work
|
Janice
and RoseMary measure the curtains
|
Chloe
labels the light switches
|
 |
 |
 |
The
Brickman workers prepare the field for grass
|
Processed
gravel is top dressed on the stone wall
|
 |
 |
 |
The
entrances to each section of the Crossroads are prepared
|
Jared
and Mitch stain the new cubbies for the Crossroads
|
Lance
and Mike install the new signs around camp
|